type: project · status: active · area: career · tags: career, mod-ichigaya, jtic, infrastructure
B4RM1 JTIC Buildout
B4RM1 JTIC Buildout
Outcome
New JTIC room (B4RM1) fully operational at MOD Ichigaya by March 2027.
Why It Matters
Stand-up of the new analytical workspace is a primary deliverable of the current MOD Ichigaya site lead role.
Next Actions
- Track cabling contractor confirmation
- Verify rack location between Rm F and Rm C
- Track power upgrade completion against the cabling NLT date (Oct 2026)
Key Decisions Made
| Date | Decision | Rationale |
|---|---|---|
| 2026-06-29 | Fiber spec: 12-core singlemode, LC/LC, ODC-to-ODC | Standard for the run |
| 2026-06-29 | Working slack: 4m at server-room full rack, 3m at in-room half rack | Slack is separate from run length |
| 2026-06-29 | Total run length: 800–900 ft (244–274 m) | Survey estimate |
| 2026-06-29 | Equipment: 36 Analyst + 2 Admin workstations, 30 VoIP phones, 3 printers | Room loadout |
| 2026-06-29 | Software: 12 SOCET GXP GeoAnalysis + 12 RemoteView Pro licenses | Analyst tooling |
| 2026-06-29 | Cabling NLT October 2026; DIEE move ~December 2026; project stand-up March 2027 | Schedule |
| 2026-06-29 | Power upgrade: contractors start 7/1, 2–3 weeks | Precedes cabling |
Room Move Cascade
DIEE vacates B3RM1 → B5RM8 Training Room moves into B3RM1 → B5RM8 fate TBD.
Key Contacts
| Name | Role | Contact |
|---|---|---|
| Matt Lyon | Technical authority | matt.j.lyon@lmco.com |
| Brady McCormick | Project Manager | — |
Open Questions
- Final rack location (Rm F vs Rm C)?
- B5RM8 disposition after the cascade?
Reference Links
Log
2026-06-29
Project note created from Claude history.